Yokogawa DO402 Dissolved Oxygen Analyzer Manual de usuario Pagina 77

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 98
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 76
IM 12J05D02-01E
Maintenance 7-3
How to replace the fuse
1) Before replacing the fuse, turn off power to the instrument at the external breaker.
2) Remove the instrument cover and the high-voltage shield plate.
3) Remove the cover from the fuse holder by pulling out by hand.
4) Remove the fuse and install a new, recommended or equivalent fuse on the holder.
5) Put the fuse cover back on the holder securely.
6) Install the high-voltage shield plate.
It is recommended that the fuse be replaced every two years even if it has not blown.
Shield Plate
Fuse Cover
Fuse Holder
Figure 7-1. How to replace the fuse
Vista de pagina 76
1 2 ... 72 73 74 75 76 77 78 79 80 81 82 ... 97 98

Comentarios a estos manuales

Sin comentarios